L’Oréal’s Kalouga factory
Vorsino, Moscow, Russia / 2017
CLIENT: L’Oréal
ARCHITECTE: NA
3 main challenges / mission / action:
- 500KWc self-produced solar power plant
- Connection to L’Oréal’s new cosmetics factory
- One of Russia’s first PV power plants
Required specifications:
500KWc connected to internal grid of L’Oréal’s new Vorsino factory
Challenges / mission / action:
- ceptional logistics due to site location
- Use of power dampening system guaranteeing zero injection onto public grid
- Bespoke design incorporating project’s climatic requirements, namely snow load and extreme temperatures
Resources harnessed by Solstyce:
- Completed in 12 weeks
- 1850 panels fitted

L’Oréal’s factory, Kalouga (Russie) NA. Image credits : Albéric VAN OVERBEKE

L’Oréal’s factory, Kalouga (Russie) NA. Image credits : Albéric VAN OVERBEKE

L’Oréal’s factory, Kalouga (Russie) NA. Image credits : Albéric VAN OVERBEKE